Contact Us
Contact us X

For immediate enquiries please call. Alternatively please leave your details and a short message below or fill out one of our enquiry forms. Our team will endeavour to respond as soon as possible.

Maroondah City Council Administration Building

Overview
Fleetwood was contracted to supply and install a new permanent modular building for the Maroondah City Council based out of the North-Eastern suburbs of Melbourne. The building is used as a general council office at the Maroondah City Council Operations Centre with the full turnkey solution being the first stage of a group of works undertaken for the city council.

Solution
Fleetwood’s role was to deliver a full turnkey solution, which specifically included a new double storey permanent modular building (13 modules). The project required 12 weeks to complete onsite (4 weeks of site works prior to the delivery of the modules along with a further 8 weeks once the modules were installed). Construction and installation of a lift, storm water reticulation system, connection of sewerage to the council mains, update and connection of an existing electrical pillar, construction of a boundary retaining wall along with the installation of screw pile and metal rail system all formed part of the scope of works.

Benefits
The advantages of delivering a modular solution is eminent as shown with the ability to deliver an entire structure and have it operational in just a few months. Upgrading from outdated
facilities to a specifically designed office hub was a major benefit for the city council who needed the extra office space as part of their growth strategy.

 

 

Enquire now

Or enter your details below and we will respond as soon as possible.